Between 2014 and 2016, the Chile’s state-owned railway company implemented a Bridges Master Plan to increase the load being transported by freight trains and put 4 different batches out to tender. The batch corresponding to the Center-North area encompassed the analysis of 71 bridges.
Out of the total analyzed bridges, 75% had been built at the end of the 19th century or at the beginning of the 20th. Most of them are steel bridges of a different typology, spanning between 6m and 80m.
The project consisted in the verification of the state of conservation of all bridges and the drafting of a repair, strengthening or replacement project. The aim was to ensure that bridges could withstand actual trains that would run along the different lines and the C+ train, heavier in design.
In order to gain an insight into the structures’ state, a detailed inspection was conducted on site. This inspection enabled to identify deteriorations and severity level and to conduct a geometric survey on all bridges. This was necessary, as there weren’t original designs for many of these bridges.
This site uses functional cookies and external scripts to improve your experience.
Privacy settings
Cookie Settings
We use cookies and similar technologies to ensure the proper functioning of our website, analyse website traffic and improve your browsing experience. You can choose which categories of cookies you allow. You can change your preferences at any time.
NOTE: These settings will only apply to the browser and device you are currently using.
Google Analytics 4
Google Analytics 4 to measure website usage and visitor behavior.